Intended Recipient |
Project Title |
Amount Requested |
Full Address of Intended Recipient |
Signed Financial Disclosure Letter |
Explanation of Request |
City of Saline |
Saline Community Center Rehabilitation Project |
$2.7 million |
100 N Harris
Street, Saline, Michigan 48176.
The project would be located at 1866 Woodland Drive E., Saline,
Michigan 48176 |
Here |
The funding would enable the city to make important improvements to its multipurpose community center that was built in 1991. Improvements to the facility will strengthen health outcomes, provide ADA-compliant accessibility, improve energy efficiency, and preserve an essential space for social, economic, and recreational engagement. |
Pittsfield Township |
Pittsfield Township Public Safety Facility Improvements Project |
$5 million |
6227 W. Michigan Avenue, Ann Arbor, Michigan 48108 |
Here |
The funding for this project would enable the township to renovate and reconstruct the aging public safety facility that provides primary fire and police department response services to the community. |
Downriver Community Conference
(DCC) |
DCC Downriver Public Safety Technology Improvement Project |
$2 million |
15100 Northline Road, Southgate, Michigan, 48195 |
Here |
The funding for this project would enable the replacement of aging public safety radio and 911 console equipment for 20 communities.
|
City of Milan |
City of Milan 2nd Street Transmission Main Replacement Project |
$1,725,000 |
147 Wabash Street, Milan, Michigan 48160 |
Here |
The funding would provide for the reconstruction of the infrastructure of 2nd Street, which includes the replacement of the 4” and 6” undersized watermain with 8” for fire protection and overall water quality. This project would allow for the elimination and replacement of all the lead and galvanized service lines in the project scope.
|
City of Trenton |
Trenton Sewage Retention Basin Project
|
$1.2 million |
2800 Third Street, Trenton, Michigan 48183 |
Here |
The funding would allow for the replacement of the east and west basin liner of the city’s retention basin system, which is 24 years old, that takes in excess inflow and stores water during severe weather events. |
City of Rockwood |
Rockwood Wastewater Treatment Plant Infrastructure Improvement Plan Project
|
$1.44 million |
32409 Fort Street, Rockwood, Michigan 48173
|
Here |
Funding for this project would allow the city to upgrade and replace the infrastructure of its treatment plant that was built in the 1930s, as much of its equipment is at or beyond its expected design life.
|
Bridgewater Township
|
Bridgewater Township Hall Expansion |
$450,000 |
10990 Clinton Road, Manchester, Michigan 48158
|
Here |
The funding would allow for a 1600 square foot expansion of the Township Hall, allowing for new conference rooms, restrooms, additional seating, an accessible kitchen, and a lobby that is accessible to all residents. |
Multi Lakes Water and Sewer Authority |
Multi Lakes Water and Sewer Authority Pollution Prevention Project |
$580,000 |
12088 N. Territorial Road, Dexter, Michigan 48130
|
Here |
Funding for this project would allow for the acquisition of new equipment, specifically a new influent screen, high performance vacuum controllers and plungers, and a new HVAC system to better remove pollutants, prevent infiltration, and improve biological processes. |
City of Plymouth
|
Plymouth Cultural Center Improvements Project
|
$1.89 million |
201 S. Main Street, Plymouth, Michigan 48170
|
Here |
Funding for this project would enable the city to make important building upgrades, like replacing the center's twenty-year-old roof under the new R-30 energy standards, and replacing its original 1972 windows. |
Ypsilanti Community Utilities Authority (YCUA) |
Ypsilanti Community Utilities Authority (YCUA) Water Main Improvement Project |
$4.165 million |
2777 State Road, Ypsilanti, MI 48198 |
Here |
Funding for this project would allow YCUA to provide necessary capital improvements within the Sugarbrook Neighborhood. |
City of Northville
|
City of Northville High Street Bridge Project
|
$1.2 million |
215 W. Main Street, Northville, Michigan 48854
|
Here |
The funding would allow the city to replace the compromised culvert that is over 100 years old and supports High Street as it crosses the Randolph Consolidated Drain. |
Canton Township |
Canton Township Bi-Directional Antennas Project |
$1.5 million |
1150 S. Canton Center Road, Canton, Michigan 48188
|
Here |
The funding for this project would support community safety by providing a Bi-Directional Antenna (BDA) and supporting communications system to provide critical interoperability and communication for all first responders. |
City of Ann Arbor |
Ann Arbor Fire Station #3 Rebuild Project
|
$5 million |
301 E. Huron Road, Ann Arbor, Michigan, 48104
|
Here |
The funding for this project would enable the city to rebuild critical infrastructure at Fire Station #3, which provides important services to downtown areas of the city and is critical in emergency response within the community during large community events. |
City of Ypsilanti |
Cross Street and Prospect Street Bridge Rehabilitation Project
|
$10.468 million |
1 S Huron Street, Ypsilanti, MI 48073
|
Here |
The funding for this project would allow the city to replace the superstructures on two vital crossings in the city to remove load postings and traffic restrictions due to the deterioration of the bridges. |
Novi Public Safety Project |
|
|
|
|
|